Our Core Services

JMS Project has over 15yrs experience in strata maintenance, reactive and
preventative, as well as Facility Management. We provide a customised solution to your individual needs which allows you to feel comfort whilst minimising risk to you and your assets.


Property Reporting

  • Common Property Safety Reports
  • Maintenance & Condition Reports
  • Part 5 Reports
  • 5 Yr Maintenance Schedule
  • Caretaker Performance Reviews
  • Drone Roof Inspection Reports
  • Thermal Imaging Reports

Facilities Management

  • Integrated Facility Management
  • Grounds and gardens maintenance
  • Utilities services
  • Life-cycle capital maintenance strategies
  • 24/7 call centre support

Maintenance Services

  • Reactive Maintenance
  • Preventative Maintenance
  • 24/7 Emergency Property Repairs

Project Management

  • Scope Management
  • Risk Management
  • Integration Management
  • Building Rectifications

Who we are

We provide a customized solution to your individual needs which allows you to feel comfort whilst minimizing risk to you and your assets.

Making Life Easy !

Customer service, reliability, and trust is the heart of our business model

JMS Project comprises of carefully vetted tradespersons & technicians, local and experienced, with relevant trade licenses. We can also be structured to support any existing scheduled arrangements that may already be in place at your property.

Our Story

JMS Project is a well-established Australian owned family operated company which has been in operation in some way, shape or form since 2004, and in its current structure since 2012. 

JMS specialise in the management and delivery of Reactive and Preventative maintenance, and Integrated Facility Services to customers throughout Queensland. We are a One-Stop-Shop focusing on the Body Corporate and Real Estate sector, however our services are also widely used throughout the Government, Commercial, and Private Housing sectors. Our services are wide, our clients are vast, and our vision is clear. We provide a customised solution to your individual needs which allows you to feel comfort whilst minimising risk to you and your assets. Brisbane based, and primarily covering areas from the Sunshine Coast to the Gold Coast, JMS prides itself on prompt and reliable service, with a fast quoting turn-around. Our company comprises of carefully selected tradesmen and technicians who have all relevant trade licences.

From casual maintenance call-outs, to scheduled maintenance plans, we cover your investment.

What Our Clients Say

As Managing Director for Australasian Body Corporate Management, our office has worked closely with JMS Project for the past 10 years.  During this time, our office has found JMS Project to provide outstanding services and therefore I can confirm their workmanship is second to none.
Services include; Balcony Balustrade Replacement, Concrete Spalling Rectification, Building Re-Painting, Full Building Maintenance & WHS Reports and Remediation, Roof Repairs and Replacements, Switchboard Replacements, and Caretaking / Facility Management Services, just to name a few. Australasian Body Corporate Management has listed JMS Project as the preferred service provider therefore, highly recommend JMS Project for all building related services.

Chaz Burdett
MD – Australasian Body Corporate Management

Steve James and his team at JMS provide a very high standard of service for our building including cleaning and
maintenance. We have recently renewed our contract with JMS, because Steve and his team at JMS have and
continue to deliver for our building and its residents.

Steve and his team also offers a wide range of specialist services and knowledge like customized cleaning options that provides additional safety against Covid as well as the management of complicated issues like audits of electrical and hot water systems. Steve will always offer his assistance and expertise to solve an issue, professionally and promptly, while also being mindful that budget is a major consideration.

We would have no hesitation in recommending JMS.

Jerdanefield Tower Body Corporate Committee,
St Lucia, Brisbane

I have been in the BCM Industry for a number of years, and have known Steve and Leith for most of it. I have found their knowledge of not only the Building and Maintenance Industry, but the intricacies of the Body Corporate Industry, to be second to none. It makes a huge difference in my role to have the confidence to be able to trust a company and it’s staff, to liaise with my clients in a manner of professionalism as I would myself.

JMS Project can offer any service in this space, which again is a fantastic benefit. It gives me great pleasure to recommend Steve, Leith and the Team at JMS, whether you are a Body Corporate Manager like myself, a Chairman of a Facility who may be looking for a Facility Manager, or simply someone just looking for honesty and professionalism in the Property Building and Maintenance space.

Leah Dowse
Strata Manager

I have worked with JMS Project on both sides of the fence. Initially I worked with them as a contracting handyman on one of the properties they were facilities managers for. This was from September 2016 and continued through to mid 2018. Subsequently in November 2018 they were engaged as facilities managers by the body corporate of the town house complex I reside in. In my role as chair of the body corporate committee, I liaise with them on a regular basis.

In both instances I have found them to be very professional in their modus operandi, reliable and personally very amenable to work with. I have no hesitation in recommending their services.

Keith Ward
Chair of the Body Corporate Committee
Corinda Villas in Oxley

Latest News

The Building Manager

The Building Manager

The building manager runs a business that is commonly known as “management rights”. Terms that are defined under the Body Corporate and Community...

read more
Project Managers Vs Caretakers

Project Managers Vs Caretakers

You know the phrase, “He’s a jack of all trades”?That used to be a good way to describe building managers of the past, but as buildings have become...

read more

JMS Info

-New Smoke Alarm Leglislation-
Will you be ready?

From 1 January 2022 new smoke alarm legislation comes into effect.

We provide solutions for
the Body Corporate
Industry

Leaving your upgrade to the last minute could result in non compliance due to the increasing demand on electrical contractors. Properties not upgraded by 2022 will not be eligible for sale or lease renewal.
From the 1st of January 2022, all landlords & real estate agents must ensure interconnected photoelectric smoke alarms are installed in all residential rental properties. With all other dwellings including owner occupied homes transitioning to full compliance by 2027.

Did You Know?

The new legislation specifies that all Queensland dwellings must have:

  • Photoelectric Smoke alarms that comply with AS3786:2014.
  • The smoke alarms must interconnect with every other smoke alarm in the dwelling.
  • Alarms must either be hardwired or powered by a non removable 10 year battery.
  • Installed in all bedrooms, hallways, and between areas containing bedrooms.
  • If there are no bedrooms on a storey, at least one smoke alarm must be installed in the most likely path of travel to exit the dwelling.

Like For Like Rule

It’s key to note that if replacing an existing smoke alarm, it must be ‘like for like’ i.e. If you currently have a hardwired alarm, this must be replaced with a hardwired alarm. 
If you are installing an alarm in an area that doesn’t currently have an alarm, this can be either a hardwired or 10 year battery photoelectric alarm however it must be able to interconnect with all the other alarms in the dwelling.

If you need to know more information please click Read More button. Then, you can download the relevant document here.

About JMS Project

Through our values JMS has built trusted processes and systems to establish ourselves as a reputable specialist in the Strata and Facility Management industry. Our 1 Stop Shop philosophy sets us apart.

  • Family owned company
  • Extensive network of fully vetted and licensed trades
  • Long Term member of Master Builders
  • We support the wider community through charity events, fundraisers and sponsorships

Contact Details

OPENING HOURS

Office – Mon to Fri 9:00 – 17:00

Sat & Sun by Appointment

Out of Hours by Appointment

PHONE NUMBER

+61 416 553 808

EMAIL

info@jmsproject.com.au

Services

  • Property Reporting
  • Facilities Management
  • Maintenance Services
  • Project Management

Social Links

How can I help you? :)

18:21